Analysis of Time, Cost, and Environmental Impact Relationships at the Building-Material Level
Article
Inyim, Peeraya, Zhu, Yimin, Orabi, Wallied. (2016). Analysis of Time, Cost, and Environmental Impact Relationships at the Building-Material Level
. JOURNAL OF MANAGEMENT IN ENGINEERING, 32(4), 10.1061/(ASCE)ME.1943-5479.0000430
Inyim, Peeraya, Zhu, Yimin, Orabi, Wallied. (2016). Analysis of Time, Cost, and Environmental Impact Relationships at the Building-Material Level
. JOURNAL OF MANAGEMENT IN ENGINEERING, 32(4), 10.1061/(ASCE)ME.1943-5479.0000430