Research
awards grant
-
2017 FDOT District 2 Employee Interviews
-
2020 Traffic Operations Employee Interviews
-
: FSUTMSOnline Web Portal Maintenance
-
A Comprehensive Study to Reduce Pedestrian Crashes in Florida
-
A Data-Driven Approach to Implementing Wrong-Way Driving Countermeasures
-
Alternatives to Steel Grid Decks - Phase II
-
An Integrated Database and Analysis System for the Evaluaton of Freeway Corridors for Potential Ramp Signaling
-
Analysis of Movable Bus Stop Boarding and Alighting Areas
-
Application of Dynamic Traffic Assignment to Advanced Managed Lane Modeling
-
Arterial Travel Time and Incident Detection- Review of Technologies and Strategies
-
Assessing the Benefits of Connected Vehicle (CV) Applications and TSM&O Strategies using SafetyAnalyst
-
Assessing the Health Impacts of Transportation Projects: Synthesis and Framework Development
-
Assessment of Structural Steel Coating Applications
-
Assessment of the Infrastructure Readiness for Connected Vehicle-to Infrastructure Applications on Arterial Streets
-
Before and After Safety Study of Roadways Where New Medians Have Been Added
-
Best Practices in the Use of Hybrid Static-Dynamic Signs
-
Closed Flume Inlet Efficiency
-
Commercial Motor Vehicle Parking Trends at Rest Areas and Weigh Stations
-
Conserve By Transit II - Carbon Footprints for Florida Transit Agencies
-
Continued Web Application Support for FDOT Office of Policy Planning
-
Creating Broward County Dashboard and Production of Monthly Report for Broward and Palm Beach Counties
-
Decision Support Tools to Support the Operations of Traffic Management Centers (TMC).
-
Demonstration of the Applications of Traffic Management Center Decision Support Tools
-
Develop Epoxy Grout Pourback Guidance and Test Methods to Eliminate Thermal/Shrinkage Cracking at Post-Tensioning Anchorages
-
Develop Epoxy Grout Pourback Guidance and Test Methods to Eliminate Thermal/Shrinkage Cracking at Post-Tensioning Anchorages, Phase 2
-
Developing Florida-specific Mobility Enhancement Factors (MEFs) and Crash Modification Factors (CMFs) for TSM&O Strategies
-
Developing a Realistic-Prototyping Road User Cost Evaluation Tool for FDOT.
-
Developing and Evaluating Smart Work Zone (SWZ) Applications
-
Development of 2021 Florida Transit Information System (FTIS)
-
Development of 2060 Florida Transportation Plan (FTP) Web Portal
-
Development of FTIS Versions 2009 and 2010.
-
Development of Florida Transit Information System (FTIS) 2013
-
Development of Florida Transit Information System Version 2011
-
Development of Improved Information Management Processes for FDOT Dispute Review Board System.
-
Development of Prototype GIS Systems for Master Networks for FSUTMS.
-
Development of SW 8th Street Adaptive Signal Control Evaluation Plan and Initial Data Processing and Validation
-
Development of Software to Support ITS Data Visualization and Incident Alarms
-
Development of Training Material for District 6 Division of Transportation Development Project
-
Development of Web FTIS 2008.
-
Development of a Computer-Based Training for FSUTMS Comprehensive Workshop.
-
Development of a Data Framework for FSUTMS.
-
District 4 ITS Research, Computer, and Miscellaneous Support (WO #462-06)
-
District Four ITS Research and Technical Support
-
District Four ITS Research and Technical Support
-
District Four ITS Research and Technical Support
-
District Four ITS Research and Technical Support (WO #462-09)
-
District Four ITS Research and Technical Support: Task Work Order # 463-05
-
District Wide ITS Operational Support Services - FIU Task Oder Nbr2.
-
Effectiveness of Stationary Police Vehicles with Blue Lights in Freeway Work Zones
-
Enhancing CRASH to Support New HSIP Reporting Requirements-Phase II
-
Enhancing CRASH to Support New HSIP Reporting Requirements.
-
Evaluating and Validating Technology Options for Estimating Transit Vehicle Occupancy in Real Time
-
Evaluating the Effectiveness of the Strategic Response Plan to Wrong-way Driving Events on Freeways
-
Evaluating the Propensity toward Telecommuting
-
Evaluation Tools to Support ITS Planning Process.
-
Evaluation of Accuracy of Travel Time Estimations for DMS Display LOA Nbr 25.
-
Evaluation of Freight and Transit Signal Priority Strategies in multi-Modal Corridor for Improving Transit Service Reliability and Efficiency
-
Evaluation of Software Platforms for Transit Service Planning for Potential Statewide Applications
-
Evaluation of Ultra-High-Performance Concrete (UHPC) Pile Splices
-
Evaluation of Vibration Limits and Mitigation Techniques for Urban Construction
-
Evaluation of Video Analytic Technologies
-
Evaluation of the Florida Keys Connecting Overseas to Advance Safe Travel (Keys COAST) Pre-deployment Phase
-
Exploring Micromobility Services in Florida
-
Express Lane Marker Color Human Factors Study on Concrete and Open-Graded Friction Course & Impact Testing for Express Lane Markers installed on Open-Graded Friction Course
-
FDOT District 1 FITSEVAL Modeling Workshop
-
FDOT District 6 Arterial Travel Time and Incident Detection Phase II
-
FDOT District VI Building envelope project
-
FDOT District VI Building envelope project-Phase 3
-
FDOT Water Repair Project
-
FITSEVAL Testing and Utilization Support
-
FITSEVAL Testing and Utilization Support
-
FITSEVAL Training, Review and Coordination with FDOT District 5
-
FSUTMS Portal Improvements and Maintenance
-
FSUTMS Portal Improvements and Maintenance
-
FSUTMS Training Workshops for 2011/2012
-
FSUTMSonline and Standard Reports Support
-
Florida APTS Program.
-
Florida DOT Modeling - FSUTMS Oneline and Standard Repor
-
Florida DOT Transportation Plan - Web Support Services 2
-
Florida ITS- Evaluation Tool Integration with FSUTMS
-
Flume Model
-
Framework for Multi-Resolution Analyses of Advanced Traffic Management Strategies
-
Generation of 2011-2014 Input Data for SafetyAnalyst
-
Generation of SafetyAnalyst Import Files for Years 2015 and 2016
-
Guidance for Identifying Corridor Conditions that Warrant Deploying Transit Signal Priority and Queue Jump
-
HVE Pedestrian and Bicycle Safety
-
HVE Pedestrian and Bicycle Safety Operations
-
ITS Evaluation Tool FITSEVAL Support
-
ITS RESEARCH, COMPUTER, AND MISCELLANEOUS SUPPORT
-
ITS RESEARCH, COMPUTER, AND MISCELLANEOUS SUPPORT (TWO #462-07)
-
ITS RESEARCH, COMPUTER, AND MISCELLANEOUS SUPPORT (WO 462-02)
-
ITS RESEARCH, COMPUTER, AND MISCELLANEOUS SUPPORT (WO 462-03)
-
ITS RESEARCH, COMPUTER, AND MISCELLANEOUS SUPPORT (WORK ORDER 462-04)
-
ITS Research and Technical Support (WO #462-08)
-
ITS Research, Computer, and Miscellaneous Support (WO #14)
-
ITS Research, Computer, and Miscellaneous Support (WONbr8).
-
ITS Research, Computer, and Miscellaneous Support WO #11
-
ITS Research, Computer, and Miscellaneous Support WO#9
-
ITS Research, Computer, and Miscellaneous Support.
-
ITS Technical & Research Support #13
-
ITS Technical Research Support #12
-
ITS Technical and Research Support #14
-
ITS Technical and Research Support #15
-
ITS Technical and Research Support Nbr10.
-
ITS Technical and Research Support Nbr11.
-
ITS Technical and Research Support Nbr5.
-
ITS Technical and Research Support Nbr7 LOA Nbr 24.
-
ITS Technical and Research Support Nbr9.
-
Identifying and Prioritizing Target Regions to Conduct Outreach Activities to Improve Safety and Mobility of Aging Population
-
Implementation of Strategies to Improve ITS InfrastrucBDV29 TWO ture Resilience in District 6
-
Improved Inspection Technique for Steel Prestressing/Post Tensioning Strands
-
Improved Processes for Meeting the Data Requirements for Implementing the Highway Safety Manual (HSM) in Florida
-
Improving SIRV Dispatching Through Analysis of the SMART Incident Database.
-
In-Service Performance Evaluation (ISPE) of G4 (1S) Strong-Post W-Beam Guardrails
-
Incident Delay Estimation and Associate Benefits
-
Incorporation of Climatic and Hydrologic Nonstationarity into FDOT Planning and Design Guidelines & Processes
-
Integrated Corridor Management and Advanced Technologies
-
Integrated Environment for Performance Measurements and Assessment of Intelligent Transportation Systems Operations
-
Investigation of E-Commerce Enabled Freight Demand and Activities in Residential Areas
-
Investigation of Open Graded Friction Course Raveling in SE Florida
-
LOA Nbr26: ITS Technical and Research Support Nbr8.
-
Lightweight Solid Decks for Movable Bridges
A Joint FIU-UCF University Research Partnership in Support of FDOT Contract
-
Lightweight Solid Decks for Movable Bridges, Phase 2
-
Local and Global Strain-Based Corrosion Detection Using Available Sensors
-
Long Term Aging of Asphalt Binders used with Reclaimed Asphalt Pavement
-
Magnetic Flux Leakage (MFL) Method for Damage Detection in Internal Post-tensioning Tendons
-
Managing Florida's Fracture Critical Bridges
-
Managing Florida's Fracture Critical Bridges
-
National Summer Transportation Institute (NSTI)
-
Needs Assessment for Transit and GIS Data Clearinghouse
-
Non-Destructive Testing (NDT) of a Segmental Concrete Bridge Scheduled for Demolition, with a Focus on Condition Assessment and Corrosion Detection of lnternal Tendons
-
Non-Destructive Testing of Ringling Bridge Tendons Using Magnetic Based Methods
-
Non-Destructive Testing of Ringling Bridge Tendons Using Magnetic Based Methods
-
On-Line Safe Routes to School (SRTS) System Pilot Program
-
Opportunities on the State Highway System to Generate Revenue or Offset Expenditures of the State of Florida
-
Optimization of Service Patrol Parameters (Phase 2)
-
Pedestrian Safety Analysis Tool
-
Pedestrian Safety Analysis Tool - Phase 2
-
Pedestrian Safety Campaign Support and Data Collection of Driver and Pedestrian Behavior at Rectangular Rapid Flashing Beacon Locations
-
Performance Evaluation of the Dura-Line's OptaSense Traffic Monitoring Solution - An FDOT District Six Case Study
-
Performance of High Performance Concrete HPC in Low pH and Sulfate Environment
-
Phase 2 Evaluation of the Florida Keys Connecting Overseas to Advance Safe Travel (Keys COAST) Post-deployment Phase
-
Phase and Widening Construction of Steel Bridges
-
Planning for Incorporating Ancillary Demands
in the Next Generation FSUTMS
-
Pre-Implementation Travel Time Study for I-95 HOT Lane Project in Miami-Dade County.
-
Precision of Florida Texture Meter
-
Preparing Florida for Deployment of SafetyAnalyst for All Roads
-
Public Transit Service Development Program
-
Quantifying the Accuracy of the Enhanced Interchange Safety Analysis Tool (ISATe) Crash Prediction Tools on Florida Freeways
-
RTMC Dispatchers and Operations Improvement Plan
-
Ramp Metering Feasibility Study on I-95 for South Florida
-
Repairs for Multi-Purpose Vehicle-1 (MPV-1) to be Delivered to UniversityCity Transportation and Management Association (UTMA) of Sweetwater, Inc., a Florida corporation
-
SR 924/NW 119 Street Adaptive Signal Control Technology (ASCT) Pilot Project Evaluation Phase 3
-
SR 924/NW 119 Street Adaptive Signal Control Technology Pilot Project Evaluation Phase I
-
SR 924/NW 119 Street Adaptive Signal Control Technology Pilot Project Evaluation Phase II
-
STR-01 Alternatives to Steel Grid Decks.
-
SW 8th Street Adaptive Signal Control Evaluation - Phase 2
-
SW 8th Street Adaptive Signal Control Evaluation Phase 3
-
SW 8th Street Adaptive Signal Control Evaluation Phase 4 on Arterial Streets
-
SW 8th Street Adaptive Signal Control Evaluation Plan - Phase 1
-
Safe Steps- Pasos Seguro Project
-
Safe-Up Remedial Action for Failed Pole/Base Plate Weld on High Mast Lighting Pole (HMLP)
-
Selection of Signal Timing Plans based on System Performance Measurement
-
Standardization of Crash Analysis in Florida
-
Statewide Analysis of Bicycle Crashes
-
Steel Framing Strategies for Highly Skewed Bridges to Reduce/Eliminate Distortion near Skewed Supports
-
Steel Plate Girder Diaphragm and Cross Bracing Loads
-
Strategic Planning Retreat - Traffic Operations Cost Center, FDOT District VI
-
Strategies to Identify and Mitigate Secondary Crashes using Real-time Traffic Data on Florida's Turnpike System
-
Strategies to Mitigate Wrong-way Driving Incidents on Arterials
-
Subproject to Main Project OSRANbr 7886(212300522): Development of Improved Information Management Processes for FDOT Dispute Review Board System.
-
Susceptibility of Bridge Steel and Concrete Components to Microbiological Influenced Corrosion (MIC) and Microbiological Influenced Deterioration (MID) in Florida
-
Synthesis of the Advance in and Application of Fractal Characteristics of Traffic Flow
-
TASK WORK ORDER NUMBER #4 - ITS (Vehicle Detector) Technology Research
-
Technical and Research Support for ITS and Traffic Engineering Projects
-
Technical and Research Support for ITS and Traffic Engineering Projects
-
Technical and Research Support for ITS and Traffic Engineering Projects
-
Technical and Research Support for ITS and Traffic Engineering Projects
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #12)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #13)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #14)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #16)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #17)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #21)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA #5)
-
Technical and Research Support for ITS and Traffic Engineering Projects (LOA#2)
-
Technical and Research Support for ITS and Traffic Engineering Projects LOA #2
-
Technical and Research Support for ITS and Traffic Engineering Projects: Task Work Order # 662-10
-
Technical and Research Support for ITS and Traffic Engineering Projects: Task Work Order # 662-11
-
Technical and Research Support for the SAFE STRIDES 2 Zero Program
-
Technology Evaluation I-95 Express Lane Changing
-
The Impacts of Emerging Mobility Options and Vehicle Technologies on Travel Behavior
-
Traffic Engineering & Technical Support Services for ITS
-
Traffic Engineering Services and ITS Technical Support.
-
Traffic Incident Management Program Assessment and Performance Measures
-
Traffic Management Simulation Development.
-
Transportation Impact Analysis of 107th Avenue Expansion.
-
Transportation Safety Center (TSC) 2018: "Provide Technical Support on Safety Analyst"
-
Travel Time Technology Evaluation
-
UTMA Transit & Technical Support
-
UTMA Transit & Technical Support
-
UniversityCity Express and Community Transit System Vehicle Repair and Enhancement
-
Update of 2022 Florida Transit Information System (FTIS)
-
Use of Advanced Analysis Tools to Support Freeway Corridor Freight Planning.
-
Use of Dynamic Traffic Assignment in Support of Transportation Planning in Florida
-
Use of Fiber Reinforced Concrete for Concrete Pavement Slab Replacement
-
Use of Fiber Reinforced Polymer Composite Cable for Post-Tensioning Applications
-
Use of Fiber Reinforced Polymer Composite Cable for Post-Tensioning Applications - Phase 2
-
Vehicle Occupancy Data Collection Methods (Phase II)
-
Vehicle-to-Everything (V2X) Data Exchange Platform
-
WORK ORDER #3: ITS RESEARCH, COMPUTER, AND MISCELLANEOUS SUPPORT
-
Water Repair Package- Additional Services for Review and Coordination
-
Work Order #15 Exploring Potential Uses of ITS Communication Backbone for Civil Infrastructure Applications