Assessment of the Infrastructure Readiness for Connected Vehicle-to Infrastructure Applications on Arterial Streets Grant

date/time interval

  • March 27, 2020 - September 30, 2022

subcontracted through

sponsor award ID

  • BDV29 TWO 977-58

local award ID

  • AWD000000011307

contributor