Develop Epoxy Grout Pourback Guidance and Test Methods to Eliminate Thermal/Shrinkage Cracking at Post-Tensioning Anchorages, Phase 2 Grant

Develop Epoxy Grout Pourback Guidance and Test Methods to Eliminate Thermal/Shrinkage Cracking at Post-Tensioning Anchorages, Phase 2 .

date/time interval

  • May 1, 2014 - January 31, 2016

sponsor award ID

  • BDV29 TWO 977-13