5G/6G mmWave Materials and Electrical Test Technology Roadmap (5G/6G MAESTRO) Grant

5G/6G mmWave Materials and Electrical Test Technology Roadmap (5G/6G MAESTRO) .

date/time interval

  • June 1, 2022 - September 30, 2023

subcontracted through

administered by

sponsor award ID

  • 70NANB22H050

contributor