Mechanisms and Conditions responsible for elevated TP levels in surface water discharges to Shark River Slough within Everglades National Park Grant

Mechanisms and Conditions responsible for elevated TP levels in surface water discharges to Shark River Slough within Everglades National Park .

date/time interval

  • July 1, 2016 - December 31, 2019

awarded by

sponsor award ID

  • P16AC01022

contributor