Florida International University
Edit Your Profile
FIU Discovery
Toggle navigation
Browse
Home
People
Organizations
Scholarly & Creative Works
Research Facilities
Support
European Journal of Operational Research
Journal
Overview
Identifiers
View All
Overview
publication venue for
Optimal location of remote dental units
. 312:969-977.
2024
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection
. 305:608-616.
2023
Infection transmission and prevention in metropolises with heterogeneous and dynamic populations
. 304:113-138.
2023
Impact of timing in post-warning prepositioning decisions on performance measures of disaster management: A real-life application
. 293:312-335.
2021
The proportionate flow shop total tardiness problem
. 284:439-444.
2020
Analysis of flow shop scheduling anomalies
. 280:25-33.
2020
New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives
. 278:149-159.
2019
Learning risk culture of banks using news analytics
. 277:770-783.
2019
The price-setting newsvendor problem with nonnegative linear additive demand
. 269:695-698.
2018
A constraint generation approach for two-machine shop problems with jobs selection
. 259:898-905.
2017
Resilient supply chain network design under competition: A case study
. 259:1017-1035.
2017
The proportionate two-machine no-wait job shop scheduling problem
. 252:131-135.
2016
The three-machine proportionate open shop and mixed shop minimum makespan problems
. 243:70-74.
2015
The two-machine no-wait general and proportionate open shop makespan problem
. 238:471-475.
2014
Robust supply chain network design with service level against disruptions and demand uncertainties: A real-life case
. 227:199-215.
2013
An O(n(2)) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines
. 221:7-13.
2012
A branch and price solution approach for order acceptance and capacity planning in make-to-order operations
. 211:480-495.
2011
A note on the classification of consumer demand functions with respect to retailer pass-through rates
. 211:213-215.
2011
Modeling of financial supply chain
. 211:47-56.
2011
Cost-based decision-making in middleware virtualization environments
. 210:344-357.
2011
A note on the effects of downstream efficiency on upstream pricing
. 200:926-928.
2010
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem
. 196:61-68.
2009
Single-machine scheduling with waiting-time-dependent due dates
. 191:576-580.
2008
Single-machine scheduling problems with past-sequence-dependent setup times
. 187:1045-1049.
2008
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines
. 187:660-666.
2008
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines
. 182:945-951.
2007
A fast method for discovering critical edge sequences in e-commerce catalogs
. 181:855-871.
2007
Single-machine and two-machine flowshop scheduling with general learning functions
. 178:402-407.
2007
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
. 177:1969-1984.
2007
Performance guarantees for flowshop heuristics to minimize makespan
. 169:865-872.
2006
Reducing incremental costs associated with the delegation of incentive contracting decisions: An analysis of planning and control decisions in a manufacturing setting in the presence of moral hazard
. 162:816-838.
2005
Concurrent flowshop scheduling to minimize makespan
. 156:524-529.
2004
Single machine scheduling with release times, deadlines and tardiness objectives
. 133:447-453.
2001
A note on scheduling flowshops with flexible stage ordering
. 129:224-229.
2001
Flow shop and open shop scheduling with a critical machine and two operations per job
. 127:120-125.
2000
Multi-attribute decision making: A simulation comparison of select methods
. 107:507-529.
1998
On the complexity of two-machine flowshop problems with due date related objectives
. 106:95-100.
1998
A new constructive heuristic for the flowshop scheduling problem
. 105:66-71.
1998
Project selection with discounted returns and multiple constraints
. 94:87-96.
1996
Optimal solutions for the machining economics problem with stochastically distributed tool lives
. 92:63-68.
1996
Single-machine scheduling with time windows and earliness/tardiness penalties
. 91:190-202.
1996
A decision model for interdependent information system project selection
. 89:380-399.
1996
SIMULTANEOUS DETERMINATION OF THE CUTTING SPEED AND LOT-SIZE VALUES IN MACHINING SYSTEMS
. 84:356-370.
1995
An analytical model for the container loading problem
. 80:68-76.
1995
A HEURISTIC FOR THE SINGLE-MACHINE TARDINESS PROBLEM
. 70:304-310.
1993
A multiperiod planning model for communications satellites
. 66:100-112.
1993
A mixed-integer programming model for a class of assortment problems
. 65:362-367.
1993
DESIGN OF TOOL MAGAZINE AND OPERATIONAL AREAS FOR A MULTITOOL MACHINE
. 63:240-253.
1992
Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem
. 47:56-64.
1990
Flexible flow shop scheduling with uniform parallel machines
2006
Makespan minimization on uniform parallel machines with release times
2004
A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems
2023
Mass casualty management in disaster scene: A systematic review of OR&MS research in humanitarian operations
2020
The single-machine total tardiness scheduling problem: Review and extensions
2010
Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection (vol 305, pg 608, 2023)
2025
A note on scheduling problems with competing agents and earliness minimization objectives
2015
A note on single-machine scheduling with job-dependent learning effects
2010
A unified analysis for the single-machine scheduling problem with controllable and non-controllable variable job processing times
2010
A faster fully polynomial approximation scheme for the single-machine total tardiness problem
2009
A note on the proportionate flow shop with a bottleneck machine
2009
A note on makespan minimization in two-stage flexible flow shops with uniform machines
2006
Single machine scheduling with release times, deadlines and tardiness objectives (vol 133, pg 447, 2001)
2005
Identifiers
International Standard Serial Number (ISSN)
0377-2217
Electronic International Standard Serial Number (EISSN)
1872-6860