Performance of the CMS Level-1 Trigger during Commissioning with Cosmic Ray Muons Preprint

Collaboration, CMS. (2009). Performance of the CMS Level-1 Trigger during Commissioning with Cosmic Ray Muons .

cited authors

  • Collaboration, CMS

authors

publication date

  • November 28, 2009

keywords

  • physics.ins-det