Assessment of water and constituent transport in the L31N canal following two hydraulic alterations to flow within and to the Everglades National Park Grant

Assessment of water and constituent transport in the L31N canal following two hydraulic alterations to flow within and to the Everglades National Park .

date/time interval

  • October 1, 2014 - December 31, 2016

awarded by

sponsor award ID

  • P14AC01405

contributor