Florida International University
Edit Your Profile
FIU Discovery
Toggle navigation
Browse
Home
People
Organizations
Scholarly & Creative Works
Research Facilities
Support
Naval Research Logistics
Journal
Overview
Identifiers
View All
Overview
publication venue for
On Equivalence Between the Proportionate Flow Shop and Single-Machine Scheduling Problems
. 62:595-603.
2015
Scheduling research and the first decade of
NRLQ
: A historical perspective
. 62:335-344.
2015
Proportionate Flow Shop: New Complexity Results and Models with Due Date Assignment
. 62:98-106.
2015
A note on combined job selection and sequencing problems
. 60:449-453.
2013
Review of the Ordered and Proportionate Flow Shop Scheduling Research
. 60:46-55.
2013
A Note on the Optimality of Index Priority Rules for Search and Sequencing Problems
. 58:83-87.
2011
Optimal burn-in procedure for periodically inspected systems
. 54:720-731.
2007
Some probability functions in reliability and their applications
. 54:128-135.
2007
A heuristic for maximizing the number of on-time jobs on two uniform parallel machines
. 53:568-575.
2006
Bounding the optimal burn-in time for a system with two types of failure
. 51:1090-1101.
2004
A general approach to the shape of failure rate and MRL functions
. 51:543-556.
2004
Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops
. 47:259-268.
2000
Comparisons of renewable warranties
. 46:91-106.
1999
Bolstering components for maximizing system lifetime
. 45:497-509.
1998
Open shop scheduling to minimize the number of late jobs
. 45:525-532.
1998
Some comparison results of system availability
. 45:205-218.
1998
Warranty policies and burn-in
. 44:199-209.
1997
Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
. 44:109-125.
1997
Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
. 44:109-125.
1997
A total tardiness problem with preprocessing included
. 43:721-735.
1996
Limiting behavior of mixtures of discrete lifetime distributions
. 43:365-380.
1996
OPTIMAL CUTOFF STRATEGIES IN CAPACITY EXPANSION PROBLEMS
. 42:1021-1039.
1995
ESTIMATION IN DISCRETE FAILURE RATE MODELS WITH A CHANGE-POINT
. 41:537-543.
1994
DISCRETE BATHTUB FAILURE RATE AND UPSIDE-DOWN BATHTUB MEAN RESIDUAL LIFE
. 40:361-371.
1993
OPTIMAL LAYERED SEARCH
. 36:43-60.
1989
A SURVEY OF THE SEARCH THEORY LITERATURE
1991
Scheduling research and the first decade of NRLQ: A historical perspective (vol 62, pg 335, 2015)
2015
Identifiers
International Standard Serial Number (ISSN)
0894-069X
Electronic International Standard Serial Number (EISSN)
1520-6750