Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
Article
Zhang, W, Yin, CY, Liu, JY et al. (2005). Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 96(2), 189-200. 10.1016/j.ijpe.2004.04.005
Zhang, W, Yin, CY, Liu, JY et al. (2005). Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 96(2), 189-200. 10.1016/j.ijpe.2004.04.005