Exploring the Optimum Cost and Time for the Project" Improvment Cemex Egypt Logistics Waiting Area"
Conference
Elkhouly, SM, Mohamed, AA, Ali, MA. (2017). Exploring the Optimum Cost and Time for the Project" Improvment Cemex Egypt Logistics Waiting Area"
. 15(1), 48-64.
Elkhouly, SM, Mohamed, AA, Ali, MA. (2017). Exploring the Optimum Cost and Time for the Project" Improvment Cemex Egypt Logistics Waiting Area"
. 15(1), 48-64.